This fit out was completed in a heritage building showcasing the original floors and columns tied together with sit to stand workstations, boardroom and meeting room.
The Fit out was completed within 4 weeks on site and the client thrilled with the final product.
This design was created to allow a fun work space with collaboration area that can transform into a Ping Pong table.
The look and feel was to combine the historical features with some modern elements to create a eye popping final product.
1 Small Waiting Reception
6 Person Boardroom
1 3 Person Meeting Rooms
8 Workstations
8 Electronic Sit to Stand Workstations
1 Kitchen breakout
1 Collaboration Zone with Ping Pong table